Join us on a journey through some of Lampson Australia’s 35+ years of engineering solutions in heavy lift and transport for the mining, petrochemical, energy and infrastructure industries. New videos and images dropping throughout 2026.
Wiggins Island Coal Export Terminal – John Holland
2550 metric tonne lift in China
Stubbo Solar Farm 2023 Trans Pacific Projects needed us to transport a 200t transformer from Port of Newcastle to site where there was no heavy lift capacity. Easy. Transport to site in a heavy duty beamset, use Gantry Jacks to unload the transformer onto an SPMT and jack and skate from SPMT into final position.
Sydney Olympic Stadium 1997 Multiplex and National Engineering Pty Ltd needed some serious cranage to lift multiple 280t roof sections from outside the stadium at 54 metres, over the structure and install at 58 metres above ground. Lampson’s Trans-Lift 2600 was the crane for the job.
Nyrstar Port Pyrie multi-metals facility – 2017. Moving the 533t Electrostatic Precipitator (ESP) Module from ship to site on self-propelled modular trailers, lifted into place using the Lampson Trans-Lift 2600. One of many components shifted and lifted on this job.
General Electric Tallawarra B gas-fired power station – 2022. Transporting the 359 tonne turbine from Port to site with a custom beamset on some multiaxle modular trailers.
Iluka Resources – Kulwin mineral sands plant relocation – 2011. 2 x 400t Manitowoc 16000 crawler cranes, 2 x 275t Link-Belt 348 crawler cranes, some modular trailers and loads of prime movers, floats and Lampson expertise.